
“CENTURY VILLAGE’S PREMIER CONTRACTORS”
Caribbean Electric is Proud to be Century Village’s Premier Contractor Having Replaced Over 3,000 Electrical Panels in the Community.
EXCLUSIVE CVE RESIDENT PRICING!
STANDARD UNIT PANEL REPLACEMENT
Price Includes:
New General Electric (GE) 100 AMP Panel and Breakers
Up to 3 Smoke Detectors (As Required per Code)
Minimal Patching
Permits, and Fees
Inspection with the City of Deerfield Beach
Sanding and Painting is not included
$1,400
100 AMP PANEL REPLACEMENT
📣 Group Special!
10+ Units in the Same Building
Only $1,300 per unit!
⚡ Bundle & Save! 💧
Water Heater + Electrical Panel Package:
Only $3,150!
$2,800
COMMON AREA PANEL REPLACEMENT
HIGH RISE BUILDING PANELS
GARDEN BUILDING PANELS
Price Includes:
City of Deerfield Beach Permits & Fees
New 100/200 AMP Panel and Breakers
Breaker Lock for Fire Alarm
Inspection with the City of Deerfield Beach
Electrical Inspection Form for Insurance Verification
$1,600

You currently have an outdated or unsafe panel: Examples:
Federal Pacific - Zinsco - Challenger - GTE/Sylvania - Fuse Box
Your electrical panel is more than 20 years old
You’ve remodeled your kitchen or bathrooms
You experience intermittent power, flickering lights, or sparks
REASONS TO REPLACE YOUR ELECTRICAL PANEL
YOU SHOULD CONSIDER REPLACING YOUR ELECTRICAL PANEL IF:
BEFORE
Outdated & Unsafe:
This 40+ year-old 100 AMP Federal Pacific panel poses serious safety risks — upgrade is strongly advised.
AFTER
Safe & Up to Code:
This is an Updated 100 AMP GE Elecrical Panel Installed by Caribbean Electric
New GE Electrical Panel and Breakers
Up to 3 Smoke Detectors Installed
Permit with the City of Deerfield Beach
Panel includes a 5-Year Manufacturer Warranty
WHAT’S INCLUDED?
INTERIOR PANEL REPLACEMENT SERVICES
COMMON ELECTRICAL ISSUES WE CAN RESOLVE
Correcting electrical work performed without a permit
Obtaining all permits and inspections on your behalf
Code violation corrections
Installation of GFCI outlets and AFCI interrupters
Electrical panel replacement and upgrades
4-Point inspection repairs
Installation of electric vehicle chargers
Plans and permits for all electrical work
Lighting installation & repairs, including motion sensor systems
WE PROVIDE EXPERT SOLUTIONS FOR:

1. Receive Your Documents
You will receive your permit application documents via email through DocuSign.
2. Review & Sign
Carefully review the documents, sign them electronically, and email them back to Caribbean Electric.
3. Processing Time
Permits are generally processed within 5–7 business days from the date of submittal.
4. We Handle Everything
Our team will:
Submit your application
Pay all necessary fees
Obtain your permit
Schedule all required inspections
Relax — we’ve got it covered from start to finish.
NEW PANEL INSTALLATION
OUR PERMIT PROCESS:
WHAT TO EXPECT ON INSTALLATION DAY
Prior to your installation date, a Caribbean Electric representative will provide you with a technician arrival time frame.
Presence is not required during the installation unless otherwise specified.
The installation process typically takes 6–9 hours to complete.
Please be aware that power will be turned off for approximately 4–8 hours during the installation.
Minor dust or debris may be generated. We recommend closing doors and/or covering personal belongings to protect them.
Ensure that the work area is clear of personal items or obstructions before our team arrives.
Minimal drywall, cutting, and patching is included as part of the service.
Painting and sanding are not included.
INSTALLATION DAY GUIDELINES:
INSPECTION PROCESS
Personal Check
A post-dated check for the full contract amount is required at the time of the permit application signing. This check will be held by Caribbean Electric and deposited upon completion of your new panel installation.
We also accept Zelle, Venmo, cash, or money orders as alternative payment methods.
Credit Card
If paying by credit card, the card information must be provided at the time of the permit application signing. The card will be securely held on file until your new panel installation is complete.
Upon completion, the credit card will be charged the full agreed upon contract amount, plus a 4% convenience fee applied to all credit card transactions.
A Caribbean Electric representative will notify you of your scheduled inspection date within 1–3 weeks following installation.
On the day of the inspection, you are not required to be present; however, Caribbean Electric must have prior instructions to access the unit. Please contact our office at 954-371-5822 to provide access details.
Inspection times are scheduled between 8:30 AM and 12:00 PM.
City of Deerfield Beach Notice: If the inspector is unable to access your unit on the scheduled inspection date, a $75 no-show inspection fee may be assessed.
PAYMENT METHODS
CANCELLATIONS
A $175 CANCELLATION FEE WILL BE APPLIED TO ALL CONTRACT CANCELLATIONS