REASONS TO REPLACE YOUR ELECTRICAL PANEL
YOU SHOULD CONSIDER REPLACING YOUR ELECTRICAL PANEL IF:
You currently have an outdated or unsafe panel: Examples:
Federal Pacific - Zinsco - Challenger - GTE/Sylvania - Fuse Box
Your electrical panel is more than 20 years old
You’ve remodeled your kitchen or bathrooms
You experience intermittent power, flickering lights, or sparks
BEFORE
Outdated & Unsafe:
This 40+ year-old 100 AMP Federal Pacific panel poses serious safety risks — upgrade is strongly advised.
AFTER
Safe & Up to Code:
This is an Updated 100 AMP GE Elecrical Panel Installed by Caribbean Electric
COMMON ELECTRICAL ISSUES WE CAN RESOLVE
WE PROVIDE EXPERT SOLUTIONS FOR:
Correcting electrical work performed without a permit
Obtaining all permits and inspections on your behalf
Code violation corrections
Installation of GFCI outlets and AFCI interrupters
Electrical panel replacement and upgrades
4-Point inspection repairs
Installation of electric vehicle chargers
Plans and permits for all electrical work
Lighting installation & repairs, including motion sensor systems
NEW PANEL INSTALLATION
OUR PERMIT PROCESS:
1. Receive Your Documents
You will receive your permit application documents via email through DocuSign.
2. Review & Sign
Carefully review & sign the documents electronically
3. Processing Time
Permits are generally processed within 5–7 business days from the date of submittal.
4. We Handle Everything
Our team will:
Submit your application
Pay all necessary fees
Obtain your permit
Schedule all required inspections
Relax — we’ve got it covered from start to finish.
WHAT TO EXPECT ON INSTALLATION DAY
INSTALLATION DAY GUIDELINES:
Prior to your installation date, a Caribbean Electric representative will provide you with a technician arrival time frame.
Presence is not required during the installation unless otherwise specified.
The installation process typically takes 4–8 hours to complete.
Please be aware that power will be turned off for approximately 4–8 hours during the installation.
Minor dust or debris may be generated. We recommend closing doors and/or covering personal belongings to protect them.
Ensure that the work area is clear of personal items or obstructions before our team arrives.
Minimal drywall, cutting, and patching is included as part of the service.
Painting and sanding are not included.
INSPECTION PROCESS
A Caribbean Electric representative will notify you of your scheduled inspection date within 1–3 weeks following installation.
On the day of the inspection, you are not required to be present; however, Caribbean Electric must have prior instructions to access the unit. Please contact our office at 954-371-5822 to provide access details.
Inspection times are scheduled between 8:30 AM and 12:00 PM.
City of Deerfield Beach Notice: If the inspector is unable to access your unit on the scheduled inspection date, a $75 no-show inspection fee may be assessed.
PAYMENT METHODS
Personal Check
A post-dated check for the full contract amount is required at the time of the permit application signing. This check will be held by Caribbean Electric and deposited upon completion of your new panel installation.
We also accept Zelle, Venmo, cash, or money orders as alternative payment methods.
Credit Card
If paying by credit card, the card information must be provided at the time of the permit application signing. The card will be securely held on file until your new panel installation is complete.
Upon completion, the credit card will be charged the full agreed upon contract amount, plus a 4% convenience fee applied to all credit card transactions.
CANCELLATIONS
A $175 CANCELLATION FEE WILL BE APPLIED TO ALL CONTRACT CANCELLATIONS